100 USD tip given for exceptional work and if the professor grades it an A. Check attachments for the 3 part lesson required to answer the topic. Answer the following 2 : 1) Consider the case of a 100,000 square foot, five-story hospital in Portland, Oregon. You will complete a conceptual estimate using reference data based on 100,000 square foot, five-story hospital, Seattle, Washington in 2003. Its unit price is $320/SF. The design variables are very similar to those in a new construction. What information would you like to collect and how you will use the information to get an estimate for hospital construction costs in Portland, OR. 2) A developer calls you at 8:00 p.m. and wants a number for the cost of a 20,000 square foot office building he is thinking about building. You’ve done all his work in the past, and you would like this project also. He needs the estimate by 9:00 a.m. the next morning. What estimating technique would you use, and why?