Using the existing literature and reports related to the High Speed 2 (HS2) project, critically analyse the risk identification techniques used to evaluate the HS2 project in the current construction phase (Phase 1). Based on your knowledge and research, propose alternative methods to be considered in the future risk identification process for the final phases (Phase 2a and Phase 2b) of the HS2 project.